Downloads

  • Leaflet

    This leaflet provides an introduction to the proposed project

  • First draft design

    This map outlines the first draft design of turbine layout for the proposed project

  • Community engagement sessions

    Information boards from the three community engagement sessions held in November and December 2018

  • Feedback

    Please use this form if you wish to provide feedback on our recent community engagement sessions

  • Noise Workshop Presentation

  • Noise Workshop Q&A

    Main Questions and Answers from the Workshop on Noise

  • Engineering Workshop Presentation

  • Design Process & Estimated Timelines

  • Engineering Workshop Q&A

    Main Questions and Answers from the Workshop on Engineering

  • Information leaflet

    This leaflet provides an update on the proposed project

  • Public Information Sessions

    Information boards from the two public information sessions held in October 2019

  • First & Second draft design

    This map outlines the first & second draft design of turbine layout for the proposed project

  • Second Draft Design

    This map outlines the second draft design of turbine layout for the proposed project

  • Site Location

    This map shows the location of the proposed wind farm

  • Site Layout

    This map outlines the proposed turbine layout for the project

  • Buffer Distance

    This map outlines the buffer distance for the proposed turbine layout

  • Grid Route

    This map shows the proposed grid route

  • Transport Route

    This map shows the proposed transport route